中文 |

Metro Line 3 and first phase of Line 6 to start trial operation on August 29th

By : InKunming | Published: 2017-August-28

[InKunming--Kunming] According to the Transportation Bureau of Kunming, metro Line 3 and first phase of Line 6 are going to start trial operation at 10:00 on August 29th.

Metro 3 runs from east to west and has 20 stations. From wes to east, these stations respectively are Xishan Park Station, Chejiabi Station, Puping Village Station, Shizui Station, Dayu Road Station, West Bus Station, Mianshan Station, Changyuan Middle Road Station, Xiyuan Station, Liangjiahe Station, City Stadium Station, Panjiawan Station, Wuyi Road Station, Dongfeng Square Station, Tuodong Stadium Station, Dashuying Station, Jinma Temple Station, Taiping Village Station, Hongqiao Station, East Bus Station.

After its trail operation, citizins are able to transfer with Merto Line 2 at Dongfeng Square Station, or transfer with first phase of Metro Line 6 at East Bus Station.

First phase of Metro Line 6 heads to the Changshui International Airport. It has 4 stations, namely the East Bus Station, Dabanqiao Station, Ahead of Airport Station, Airport Centre Station.

The two lines will both be priced by mileage.

Click here to view Chinese report.

(Editors:Tracy,Rachel)

The content (including but not limited to text, photo, multimedia information, etc) published on this site, with " InKunming" being given as the source, belongs to Kunming Information Hub Media Ltd. Reproduction in whole or in part without permission is prohibited.

Copyright © 2008 Kunming All rights reserved. Reproduction in whole or in part without permission is prohibited.E-mail: inkunmingkmxxg@hotmail.com