中文 |

Metro Line 1 and 2 adjust service time, terminal station

By : InKunming | Published: 2016-September-29

[InKunming--Kunming]  Branch Line of Metro Line 1 is estimated to start trail operation from October 3th on, in order to make sure taht it will be opened along with the newly built High-speed Railway Station synchronously.

Service Time

The operative time will postpone twenty minutes, namely, departure time of the last train will change from 22: 00 into 22:20.

Terminal Station

It is worthwhile to notice terminal station of partial trains will be changed to Chunrong Street Station according to the adjustment. Rest of trains will still head to University Downtown Station.

Helpline Number

Besides, the helpline will changes from 0871-63601806 to 0871-96596 since October 3th. Citizens can call the two numbers until December 31th, but noting that 0871-63601806 will stop using from the first day of 2017.

In a nutshell, passengers should notice the information on the PIS and listen to the broadcast when riding a metro. If you get confused about the routes, you can also ask staffs of metro for help.

Click here to view Chinese report.

(Editors: Rachel, Cathy)

The content (including but not limited to text, photo, multimedia information, etc) published on this site, with " InKunming" being given as the source, belongs to Kunming Information Hub Media Ltd. Reproduction in whole or in part without permission is prohibited.

Copyright © 2008 Kunming All rights reserved. Reproduction in whole or in part without permission is prohibited.E-mail: inkunmingkmxxg@hotmail.com